Construction programme intelligence

Build smarter.Deliver on time.

Altov Flow is the all-in-one platform for construction programme management — drag-and-drop Gantt scheduling, AI weather-risk assessment, live progress tracking, and AI-generated programmes from your architectural drawings.

Drag & Drop

Gantt scheduling

Critical Path

Auto-computed

Weather AI

Risk assessment

AI Programmes

From drawings

Everything in one platform

All the tools to keep your project on track

From the first drawing to final handover, Altov Flow unifies scheduling, weather intelligence and progress reporting in one place.

Schedule Integrity Check

XER Toolkit-aligned scoring across 46 metrics with NEC Clause 31/32/62, JCT, DCMA and tender presets — dials, drill-downs and branded exports.

Interactive Gantt Scheduling

Drag-and-drop bars to reschedule tasks, resize durations, and draw new bars directly on the timeline.

Critical Path Analysis

Automatic float calculations surface your critical path so you always know what truly matters.

Recovery Planning & Projections

Scenario-based modelling forecasts realistic project end dates and tests delay-recovery options before you commit.

AI Weather-Risk Agent

A conversational agent assesses weather delays and links them directly to affected activities.

Design-to-Programme AI

Draw a building in the 2D designer, or upload drawings and IFC models — AI generates the programme and procurement list in minutes.

Live Progress & Analytics

Percent Plan Complete, S-curve planned-vs-actual tracking, histograms and delay analytics in real time.

NEC Clause 32 Narratives

Auto-drafted revised-programme narratives summarising progress, changes and delays since the last issue.

Programme Version Library

Every upload versioned by year and month — a full historical record of your project's programme evolution.

Procurement Tracking

Assign owners, quantities and linked activities across a categorised procurement schedule.

Architectural Drawing Library

Centralise, categorise, and version every drawing — site plans, floor plans, MEP, structural and more.

Asta & P6 Import

Import native Asta Powerproject (.pp), Asta XML, MSPDI and P6 XML — hierarchy, links, calendars, resources and progress preserved.

Programme Export & Round-Trip

Export MSPDI or P6 XER files back to Asta Powerproject or Primavera, plus branded PDF reports.

AI Project Insights

Ask plain-English questions about your project — the AI reads activities, weather and diaries to answer.

Digital Site Diary

Daily records of personnel, plant, materials, visitors and delays — exportable as branded PDFs.

Voice Task Completion

Mark activities complete by voice — hands-on-site, no keyboard required.

Geotagged Progress Photos

Pin site photos to activities and map locations for a visual progress record.

Google Calendar Sync

Push activities to a dedicated project calendar so the whole team sees the schedule.

Location-Aware Weather

Daily weather feeds for each project site, with bank-holiday and non-working-day scheduling.

Multi-User Client Access

Assign multiple users per client and give stakeholders secure, role-based project visibility.

Secure & Role-Based

Admins manage everything; clients see only what they need to — all backed by secure authentication.

Scheduling

A Gantt chart that works the way you do

Drag bars to reschedule, pull edges to adjust durations, or draw new tasks straight onto the timeline. Dependencies cascade automatically, the critical path highlights itself, and baselines show exactly where you have slipped.

  • Drag, resize & draw-to-create bars
  • Auto-cascading FS / SS / FF / SF dependencies
  • Baseline tracking & progress fill
  • Bank-holiday & weekend-aware non-working days
Programme · Riverside Apartments Phase 2
GanttCritical path
UTID
Task Name
Dur
Start
Finish
S5
Facade & Cladding
5w 3d
22/06/26
29/07/26
T110
Curtain wall installation – L1
5d
22/06/26
26/06/26
T111
Curtain wall installation – L2
5d
29/06/26
03/07/26
T112
Curtain wall installation – L3
5d
06/07/26
10/07/26
T113
Feature brickwork spandrel
3d
13/07/26
15/07/26
T114
Balcony glazed screens & rail
5d
23/07/26
29/07/26
S6
M&E Rough-In
8w
22/06/26
14/08/26
T120
HVAC ductwork – lower floors
5d
22/06/26
26/06/26
T121
Plumbing first fix – main risers
5d
29/06/26
03/07/26
T122
Electrical containment – floors
5d
06/07/26
10/07/26
22 Jun
29 Jun
06 Jul
13 Jul
20 Jul
27 Jul
03 Aug
10 Aug
22
23
24
25
26
27
28
29
30
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
1
2
3
4
5
6
7
8
9
10
11
12
13
14
5/5dCurtain wall installation – L1
5/5dCurtain wall installation – L2
5/5dCurtain wall installation – L3
3/5dFeature brickwork spandrel
5/5dBalcony glazed screens & rail
5/5dHVAC ductwork – lower floors
5/5dPlumbing first fix – main risers
5/5dElectrical containment – floors

Weather AI

See weather delays before they happen

A built-in AI agent reads your project location, forecasts adverse weather, and links likely delays to the activities most at risk — so you can re-plan before the rain hits.

  • Conversational weather-risk assessment
  • Daily weather feeds per project site
  • Auto-linked delay-to-activity mapping
  • Weather-delay audit trail for extensions of time
See weather delays before they happen

Drawings & AI Programmes

Turn drawings into a programme

Upload your architectural drawings — floor plans, sections, MEP, structural — and Altov Flow AI extracts the works and generates a structured construction programme automatically.

  • Categorised, versioned drawing library
  • AI programme generation from PDFs & images
  • Site plans, floor plans, elevations & more
  • One-click bulk activity creation
Turn drawings into a programme

Reports & Analytics

Know where you stand, every day

Percent Plan Complete, planned-vs-actual curves, delay status and critical-path reports give you and your client a clear, honest picture of programme health at any moment.

  • PPC (Percent Plan Complete) tracking
  • Planned-vs-actual progress curves
  • Delay & overdue activity analytics
  • Export to PDF for client reporting

Planned vs Actual — Programme Progress

Baseline vs live programme · Riverside Apartments Phase 2

31d behind
Schedule variance (project end):31d behind scheduleActuals recorded up to 01 Aug 2026
May 26Jun 26Jul 26Aug 26Sep 26Oct 26Nov 26Dec 26Jan 2705511016522031d gapData date
  • Planned (baseline work-days)
  • Actual (earned work-days)
  • Forecast (at plan)

Total Planned

210work-days

Total Actual

69work-days

Completion

33%

Schedule Integrity Check

Prove your programme is contract-compliant

A XER Toolkit-aligned integrity engine scores your schedule across 46 metrics — missing logic, leads and lags, float, constraints, out-of-sequence progress — rolled into a weighted points score with a clear PASS/FAIL verdict.

  • 46 scored metrics with green/amber/red trigger bands
  • NEC Clause 31/32/62, JCT, DCMA & tender contract presets
  • Dials, drill-down lists & where-points-were-lost analysis
  • Branded PDF & Excel exports for client submissions

Schedule Integrity — All Metrics

Data date 29 May 2026 · Riverside Apartments Phase 2

FAIL

56%

Integrity

Pass 27
Amber 5
Fail 14

Score

233 / 415 pts

Pass threshold

85%

Missing Predecessors
38 / 233Fail
Relationship Ratio
23 / 238Fail
Open-Start Tasks
8 / 233Amber
High Duration
2 / 233Pass
Out of Sequence
10 linksFail
Logical Loops
0Pass

Ready to take control of your programme?

We're rolling out Altov Flow to a select number of clients. Sign up below and our team will contact you to arrange trial access.

Already an Altov Flow client? Use Sign In to access your dashboard.

No software to install Secure role-based access Mobile & desktop
Altov Flow

© 2026 Altov Flow. Construction programme intelligence.